Valley terminal · 1,120 m
Falzgrund
Iron-and-glass trainshed from 1912, rebuilt 1979. Connection to the postal bus and the lake steamer pier.
Falzgrund · Treeline · Sattelhorn
Three stops, each one a different century of building. The station hall at Falzgrund keeps the original 1912 clock, which runs two minutes fast and has run two minutes fast since the year it was installed. Nobody will let the watchmaker near it.
Valley terminal · 1,120 m
Iron-and-glass trainshed from 1912, rebuilt 1979. Connection to the postal bus and the lake steamer pier.
Crossing loop · 1,690 m
Where trains pass. The sawmill road, the school stop, and the start of the Panoramaweg trail.
Summit station · 2,540 m
2,540 metres, a revolving restaurant, and the small observatory that keeps the Night Owl in business.